oai:arXiv.org:1407.6324 [pdf] - 855928
Advanced LIGO Two-Stage Twelve-Axis Vibration Isolation and Positioning
Platform. Part 2: Experimental Investigation and Tests Results
Matichard, Fabrice;
Lantz, Brian;
Mason, Kenneth;
Mittleman, Richard;
Abbott, Benjamin;
Abbott, Samuel;
Allwine, Eric;
Barnum, Samuel;
Birch, Jeremy;
Biscans, Sebastien;
Clark, Daniel;
Coyne, Dennis;
DeBra, Dan;
DeRosa, Ryan;
Foley, Stephany;
Fritschel, Peter;
Giaime, Joseph A;
Gray, Corey;
Grabeel, Gregory;
Hanson, Joe;
Hillard, Michael;
Kissel, Jeffrey;
Kucharczyk, Christopher;
Roux, Adrien Le;
Lhuillier, Vincent;
Macinnis, Myron;
OReilly, Brian;
Ottaway, David;
Paris, Hugo;
Puma, Michael;
Radkins, Hugh;
Ramet, Celine;
Robinson, Mitchell;
Ruet, Laurent;
Sareen, Pradeep;
Shoemaker, Daivid;
Stein, Andy;
Thomas, Jeremy;
Vargas, Michael;
Warner, Jimmy
Submitted: 2014-07-23
This paper presents the results of the past seven years of experimental
investigation and testing done on the two-stage twelve-axis vibration isolation
platform for Advanced LIGO gravity waves observatories. This five-ton
two-and-half-meter wide system supports more than a 1000 kg of very sensitive
equipment. It provides positioning capability and seismic isolation in all
directions of translation and rotation. To meet the very stringent requirements
of Advanced LIGO, the system must provide more than three orders of magnitude
of isolation over a very large bandwidth. It must bring the motion below
10^(-11) m/(Hz)^0.5 at 1 Hz and 10^(-12) m/(Hz)^0.5 at 10 Hz. A prototype of
this system has been built in 2006. It has been extensively tested and analyzed
during the following two years. This paper shows how the experimental results
obtained with the prototype were used to engineer the final design. It
highlights how the engineering solutions implemented not only improved the
isolation performance but also greatly simplified the assembly, testing, and
commissioning process. During the past two years, five units have been
constructed, tested, installed and commissioned at each of the two LIGO
observatories. Five other units are being built for an upcoming third
observatory. The test results presented show that the system meets the motion
requirements, and reach the sensor noise in the control bandwidth.