Normalized to: Ruiz, V.
[1]
oai:arXiv.org:1712.03029 [pdf] - 1747848
BIOSTIRLING-4SKA : A cost effective and efficient approach for a new
generation of solar dish-Stirling plants based on storage and hybridization;
An Energy demo project for Large Scale Infrastructures",
Barbosa, Domingos;
Andre, Paulo;
Antunes, Paulo;
Paixao, Tiago;
Marques, Carlos;
van Ardenne, Arnold;
Kant, Dion;
Ebbendorf, Nico;
Gonzalez, Luis Saturnino;
Rubio, Diego;
Verdes-Montenegro, Lourdes;
Garcia, Emilio;
Calama, Irene;
Caballero, Francisco;
Eskilson, Per;
Gustavsson, Lars;
Anderson, Conny;
Lindh, Jonah;
Keller, Reinhard;
Perez, Manuel Silva;
Lobo, Gonzalo;
Ruiz, Valeriano;
Pino, Javier;
Valverde, Luis;
Holze, Carsten;
Isaza, Daniel;
Misseeeuw, Rik;
Pfanner, Norbert;
Schies, Alexandre;
Konttinen, Jukka T.;
Consortium, The Biostirling
Submitted: 2017-12-08, last modified: 2018-09-11
The BIOSTIRLING - 4SKA (B4S) is a EU demonstration project dealing with the
implementation of a cost-effective and efficient new generation of solar
dish-Stirling plants based on hybridization and efficient storage at the
industrial scale. The main goal of the B4S demonstration project is the
generation of electric power using simultaneously solar power and gas to supply
an isolated system and act as a scalable example of potential power supply for
many infrastructures, including future sustainable large scientific
infrastructures. B4S build an interdisciplinary approach to address
reliability, maintainability and costs of this technology. In April 2017, B4S
successfully tested in Portugal the first world Stirling hybrid system
providing about 4kW of power to a phased array of antennas, overcoming
challenges in Stirling and hybridization and smartgrid technologies. B4SKA
Consortium, with fourteen companies from six European countries, has performed
the engineering, construction, assembly and experimental exploitation, under
contract signed with the European to develop on off-grid demonstrator in
Contenda (Moura) Portugal.
[2]
oai:arXiv.org:1609.07943 [pdf] - 1486252
First results of the Test-Bed Telescopes (TBT) project: Cebreros
telescope commissioning
Submitted: 2016-09-26
The TBT project is being developed under ESA's General Studies and Technology
Programme (GSTP), and shall implement a test-bed for the validation of an
autonomous optical observing system in a realistic scenario within the Space
Situational Awareness (SSA) programme of the European Space Agency (ESA). The
goal of the project is to provide two fully robotic telescopes, which will
serve as prototypes for development of a future network. The system consists of
two telescopes, one in Spain and the second one in the Southern Hemisphere. The
telescope is a fast astrograph with a large Field of View of 2.5 x 2.5
square-degrees and a plate scale of 2.2 arcsec/pixel. The tube is mounted on a
fast direct-drive mount moving with speed up to 20 degrees per second. The
focal plane hosts a 2-port 4K x 4K back-illuminated CCD with readout speeds up
to 1MHz per port. Detection software and hardware are optimised for the
detection of NEOs and objects in high Earth orbits (objects moving from 0.1-40
arcsec/second). Every night it takes all the input needed and prepares a
schedule following predefined rules allocating tasks for the telescopes.
Telescopes are managed by RTS2 control software, that performs the real-time
scheduling of the observation and manages all the devices at the observatory.1
At the end of the night the observing systems report astrometric positions and
photometry of the objects detected. The first telescope was installed in
Cebreros Satellite Tracking Station in mid-2015. We evaluate the site
characteristics and the performance of the TBT Cebreros telescope in the
different modes and strategies. Average residuals for asteroids are under 0.5
arcsecond, while they are around 1 arcsecond for upper-MEO and GEO satellites.
The survey depth is dimmer than magnitude 18.5 for 30-second exposures with the
usual seeing around 4 arcseconds.
[3]
oai:arXiv.org:1210.4972 [pdf] - 578371
Power Challenges of Large Scale Research Infrastructures: the Square
Kilometer Array and Solar Energy Integration; Towards a zero-carbon footprint
next generation telescope
Barbosa, Domingos;
Márquez, Gonzalo Lobo;
Ruiz, Valeriano;
Silva, Manuel;
Verdes-Montenegro, Lourdes;
Santander-Vela, Juande;
Maia, Dalmiro;
Antón, Sonia;
van Ardenne, Arnold;
Vetter, Matthias;
Kramer, Michael;
Keller, Reinhard;
Pereira, Nuno;
Silva, Vitor;
Consortium, The BIOSTIRLING
Submitted: 2012-10-17
The Square Kilometer Array (SKA) will be the largest Global science project
of the next two decades. It will encompass a sensor network dedicated to
radioastronomy, covering two continents. It will be constructed in remote areas
of South Africa and Australia, spreading over 3000Km, in high solar irradiance
latitudes. Solar Power supply is therefore an option to power supply the SKA
and contribute to a zero carbon footprint next generation telescope. Here we
outline the major characteristics of the SKA and some innovation approaches on
thermal solar energy Integration with SKA prototypes.