sort results by

Use logical operators AND, OR, NOT and round brackets to construct complex queries. Whitespace-separated words are treated as ANDed.

Show articles per page in mode

Ruiz, Valeriano

Normalized to: Ruiz, V.

3 article(s) in total. 44 co-authors, from 1 to 2 common article(s). Median position in authors list is 6,0.

[1]  oai:arXiv.org:1712.03029  [pdf] - 1747848
BIOSTIRLING-4SKA : A cost effective and efficient approach for a new generation of solar dish-Stirling plants based on storage and hybridization; An Energy demo project for Large Scale Infrastructures",
Comments: 7 pages; 8 Figures; Proceedings of the 7th International Workshop on Integration of Solar Power into Power Systems, 2C_5_SIW17_299, Ed. Uta Betancourt, Thomas Ackermann, Berlin, Germany, 24-25th October 2017; Authorship and other final updates
Submitted: 2017-12-08, last modified: 2018-09-11
The BIOSTIRLING - 4SKA (B4S) is a EU demonstration project dealing with the implementation of a cost-effective and efficient new generation of solar dish-Stirling plants based on hybridization and efficient storage at the industrial scale. The main goal of the B4S demonstration project is the generation of electric power using simultaneously solar power and gas to supply an isolated system and act as a scalable example of potential power supply for many infrastructures, including future sustainable large scientific infrastructures. B4S build an interdisciplinary approach to address reliability, maintainability and costs of this technology. In April 2017, B4S successfully tested in Portugal the first world Stirling hybrid system providing about 4kW of power to a phased array of antennas, overcoming challenges in Stirling and hybridization and smartgrid technologies. B4SKA Consortium, with fourteen companies from six European countries, has performed the engineering, construction, assembly and experimental exploitation, under contract signed with the European to develop on off-grid demonstrator in Contenda (Moura) Portugal.
[2]  oai:arXiv.org:1609.07943  [pdf] - 1486252
First results of the Test-Bed Telescopes (TBT) project: Cebreros telescope commissioning
Comments: 9 pages, 5 figures
Submitted: 2016-09-26
The TBT project is being developed under ESA's General Studies and Technology Programme (GSTP), and shall implement a test-bed for the validation of an autonomous optical observing system in a realistic scenario within the Space Situational Awareness (SSA) programme of the European Space Agency (ESA). The goal of the project is to provide two fully robotic telescopes, which will serve as prototypes for development of a future network. The system consists of two telescopes, one in Spain and the second one in the Southern Hemisphere. The telescope is a fast astrograph with a large Field of View of 2.5 x 2.5 square-degrees and a plate scale of 2.2 arcsec/pixel. The tube is mounted on a fast direct-drive mount moving with speed up to 20 degrees per second. The focal plane hosts a 2-port 4K x 4K back-illuminated CCD with readout speeds up to 1MHz per port. Detection software and hardware are optimised for the detection of NEOs and objects in high Earth orbits (objects moving from 0.1-40 arcsec/second). Every night it takes all the input needed and prepares a schedule following predefined rules allocating tasks for the telescopes. Telescopes are managed by RTS2 control software, that performs the real-time scheduling of the observation and manages all the devices at the observatory.1 At the end of the night the observing systems report astrometric positions and photometry of the objects detected. The first telescope was installed in Cebreros Satellite Tracking Station in mid-2015. We evaluate the site characteristics and the performance of the TBT Cebreros telescope in the different modes and strategies. Average residuals for asteroids are under 0.5 arcsecond, while they are around 1 arcsecond for upper-MEO and GEO satellites. The survey depth is dimmer than magnitude 18.5 for 30-second exposures with the usual seeing around 4 arcseconds.
[3]  oai:arXiv.org:1210.4972  [pdf] - 578371
Power Challenges of Large Scale Research Infrastructures: the Square Kilometer Array and Solar Energy Integration; Towards a zero-carbon footprint next generation telescope
Comments: 4 pages; 3 figures. Paper accepted for presentation at Proceedings of the 2nd International Workshop on Integration on Solar Power into Power Systems; 12th-13th November, 2012, Lisbon, Portugal
Submitted: 2012-10-17
The Square Kilometer Array (SKA) will be the largest Global science project of the next two decades. It will encompass a sensor network dedicated to radioastronomy, covering two continents. It will be constructed in remote areas of South Africa and Australia, spreading over 3000Km, in high solar irradiance latitudes. Solar Power supply is therefore an option to power supply the SKA and contribute to a zero carbon footprint next generation telescope. Here we outline the major characteristics of the SKA and some innovation approaches on thermal solar energy Integration with SKA prototypes.