Normalized to: Paul, P.
[1]
oai:arXiv.org:astro-ph/0504325 [pdf] - 72422
SPI energy calibration
Lonjou, V.;
Knodlseder, J.;
Roques, J. P.;
Skinner, G. K.;
von Ballmoos, P.;
Jean, P.;
Paul, P.;
Weidenspointner, G.;
Wunderer, C.;
Schanne, S.
Submitted: 2005-04-14
The status of the SPI energy calibration after the first year of INTEGRAL
operations is reported. We have studied the gain variations and we have
demonstrated that the most important parameter is the germanium detector
temperature. This study permits us to determine the limits of our calibration
method and the frequency of calibrations needed.
[2]
oai:arXiv.org:astro-ph/0310793 [pdf] - 60456
SPI/INTEGRAL in-flight performance
Roques, J. -P.;
Schanne, S.;
von Kienlin, A.;
Knödlseder, J.;
Briet, R.;
Bouchet, L.;
Paul, Ph.;
Boggs, S.;
Caraveo, P.;
Cassé, M.;
Cordier, B.;
Diehl, R.;
Durouchoux, P.;
Jean, P.;
Leleux, P.;
Lichti, G.;
Mandrou, P.;
Matteson, J.;
Sanchez, F.;
Schönfelder, V.;
Skinner, G.;
Strong, A.;
Teegarden, B.;
Vedrenne, G.;
von Ballmoos, P.;
Wunderer, C.
Submitted: 2003-10-28
The SPI instrument has been launched on-board the INTEGRAL observatory on
October 17, 2002. SPI is a spectrometer devoted to the sky observation in the
20 keV-8 MeV energy range using 19 germanium detectors. The performance of the
cryogenic system is nominal and allows to cool the 19 kg of germanium down to
85 K with a comfortable margin. The energy resolution of the whole camera is
2.5 keV at 1.1 MeV. This resolution degrades with time due to particle
irradiation in space. We show that the annealing process allows the recovery of
the initial performance. The anticoincidence shield works as expected, with a
low threshold at 75 keV, reducing the GeD background by a factor of 20. The
digital front-end electronics system allows the perfect alignement in time of
all the signals as well as the optimisation of the dead time (12%). We
demonstrate that SPI is able to map regions as complex as the galactic plane.
The obtained spectrum of the Crab nebula validates the present version of our
response matrix. The 3 $\sigma$ sensitivity of the instrument at 1 MeV is 8
10$^{-7}$ph$\cdot$cm$^{-2}\cdot$s$^{-1}\cdot$keV$^{-1}$ for the continuum and 3
10$^{-5}$ph$\cdot$cm$^{-2}\cdot$s$^{-1}$ for narrow lines.
[3]
oai:arXiv.org:astro-ph/0310792 [pdf] - 1567949
Calibration of the Spectrometer aboard the INTEGRAL satellite
Schanne, Stéphane;
Cordier, B.;
Gros, M.;
Attié, D.;
Ballmoos, P. v.;
Bouchet, L.;
Carli, R.;
Connell, P.;
Diehl, R.;
Jean, P.;
Kiener, J.;
Kienlin, A. v.;
Knödlseder, J.;
Laurent, P.;
Lichti, G.;
Mandrou, P.;
Paul, J.;
Paul, P.;
Roques, J. -P.;
Sanchez, F.;
Schönfelder, V.;
Shrader, C.;
Skinner, G.;
Strong, A.;
Sturner, S.;
Tatischeff, V.;
Teegarden, B.;
Vedrenne, G.;
Weidenspointner, G.;
Wunderer, C.
Submitted: 2003-10-28
SPI, the Spectrometer on board the ESA INTEGRAL satellite, to be launched in
October 2002, will study the gamma-ray sky in the 20 keV to 8 MeV energy band
with a spectral resolution of 2 keV for photons of 1 MeV, thanks to its 19
germanium detectors spanning an active area of 500 cm2. A coded mask imaging
technique provides a 2 deg angular resolution. The 16 deg field of view is
defined by an active BGO veto shield, furthermore used for background
rejection. In April 2001 the flight model of SPI underwent a one-month
calibration campaign at CEA in Bruy\`eres le Ch\^atel using low intensity
radioactive sources and the CEA accelerator for homogeneity measurements and
high intensity radioactive sources for imaging performance measurements. After
integration of all scientific payloads (the spectrometer SPI, the imager IBIS
and the monitors JEM-X and OMC) on the INTEGRAL satellite, a cross-calibration
campaign has been performed at the ESA center in Noordwijk. A set of sources
has been placed in the field of view of the different instruments in order to
compare their performances and determine their mutual influence. Some of those
sources had already been used in Bruy\`eres during the SPI standalone test. For
the lowest energy band calibration an X-ray generator has been used. We report
on the scientific goals of this calibration activity, and present the
measurements performed as well as some preliminary results.
[4]
oai:arXiv.org:astro-ph/0308504 [pdf] - 58783
INTEGRAL/SPI ground calibration
Attié, D.;
Cordier, B.;
Gros, M.;
Laurent, Ph.;
Schanne, S.;
Tauzin, G.;
von Ballmoos, P.;
Bouchet, L.;
Jean, P.;
Knödlseder, J.;
Mandrou, P.;
Paul, Ph.;
Roques, J. -P.;
Skinner, G.;
Vedrenne, G.;
Georgii, R.;
von Kienlin, A.;
Lichti, G.;
Schönfelder, V.;
Strong, A.;
Wunderer, C.;
Shrader, C.;
Sturner, S.;
Teegarden, B.;
Weidenspointner, G.;
Kiener, J.;
Porquet, M. -G.;
Tatischeff, V.;
Crespin, S.;
Joly, S.;
André, Y.;
Sanchez, F.;
Leleux, P.
Submitted: 2003-08-28
Three calibration campaigns of the spectrometer SPI have been performed
before launch in order to determine the instrument characteristics, such as the
effective detection area, the spectral resolution and the angular resolution.
Absolute determination of the effective area has been obtained from simulations
and measurements. At 1 MeV, the effective area is 65 cm^2 for a point source on
the optical axis, the spectral resolution ~2.3 keV. The angular resolution is
better than 2.5 deg and the source separation capability about 1 deg. Some
temperature dependant parameters will require permanent in-flight calibration.