sort results by

Use logical operators AND, OR, NOT and round brackets to construct complex queries. Whitespace-separated words are treated as ANDed.

Show articles per page in mode

Norrod, R. D.

Normalized to: Norrod, R.

3 article(s) in total. 36 co-authors, from 1 to 2 common article(s). Median position in authors list is 9,0.

[1]  oai:arXiv.org:1502.01280  [pdf] - 1224317
The GBT 67 -- 93.6 GHz Spectral Line Survey of Orion-KL
Comments: 14 pages, including 4 figures and 4 tables. Accepted for publication in AJ. The supplementary material including the complete calibrated spectrum is available online from AJ upon publication (dfrayer@nrao.edu)
Submitted: 2015-02-04
We present a 67--93.6 GHz spectral line survey of Orion-KL with the new 4 mm Receiver on the Green Bank Telescope (GBT). The survey reaches unprecedented depths and covers the low-frequency end of the 3 mm atmospheric window which has been relatively unexplored previously. The entire spectral-line survey is published electronically for general use by the astronomical community. The calibration and performance of 4 mm Receiver on the GBT is also summarized.
[2]  oai:arXiv.org:0912.0204  [pdf] - 1018578
Phased Array Feed Calibration, Beamforming and Imaging
Comments: 19 pages, 13 figures
Submitted: 2009-12-01
Phased array feeds (PAFs) for reflector antennas offer the potential for increased reflector field of view and faster survey speeds. To address some of the development challenges that remain for scientifically useful PAFs, including calibration and beamforming algorithms, sensitivity optimization, and demonstration of wide field of view imaging, we report experimental results from a 19 element room temperature L-band PAF mounted on the Green Bank 20-Meter Telescope. Formed beams achieved an aperture efficiency of 69% and system noise temperature of 66 K. Radio camera images of several sky regions are presented. We investigate the noise performance and sensitivity of the system as a function of elevation angle with statistically optimal beamforming and demonstrate cancelation of radio frequency interference sources with adaptive spatial filtering.
[3]  oai:arXiv.org:0908.3826  [pdf] - 27641
Large Instrument Development for Radio Astronomy
Comments:
Submitted: 2009-08-26
This white paper offers cautionary observations about the planning and development of new, large radio astronomy instruments. Complexity is a strong cost driver so every effort should be made to assign differing science requirements to different instruments and probably different sites. The appeal of shared resources is generally not realized in practice and can often be counterproductive. Instrument optimization is much more difficult with longer lists of requirements, and the development process is longer and less efficient. More complex instruments are necessarily further behind the technology state of the art because of longer development times. Including technology R&D in the construction phase of projects is a growing trend that leads to higher risks, cost overruns, schedule delays, and project de-scoping. There are no technology breakthroughs just over the horizon that will suddenly bring down the cost of collecting area. Advances come largely through careful attention to detail in the adoption of new technology provided by industry and the commercial market. Radio astronomy instrumentation has a very bright future, but a vigorous long-term R&D program not tied directly to specific projects needs to be restored, fostered, and preserved.