sort results by

Use logical operators AND, OR, NOT and round brackets to construct complex queries. Whitespace-separated words are treated as ANDed.

Show articles per page in mode

Misseeeuw, Rik

Normalized to: Misseeeuw, R.

1 article(s) in total. 30 co-authors. Median position in authors list is 27,0.

[1]  oai:arXiv.org:1712.03029  [pdf] - 1747848
BIOSTIRLING-4SKA : A cost effective and efficient approach for a new generation of solar dish-Stirling plants based on storage and hybridization; An Energy demo project for Large Scale Infrastructures",
Comments: 7 pages; 8 Figures; Proceedings of the 7th International Workshop on Integration of Solar Power into Power Systems, 2C_5_SIW17_299, Ed. Uta Betancourt, Thomas Ackermann, Berlin, Germany, 24-25th October 2017; Authorship and other final updates
Submitted: 2017-12-08, last modified: 2018-09-11
The BIOSTIRLING - 4SKA (B4S) is a EU demonstration project dealing with the implementation of a cost-effective and efficient new generation of solar dish-Stirling plants based on hybridization and efficient storage at the industrial scale. The main goal of the B4S demonstration project is the generation of electric power using simultaneously solar power and gas to supply an isolated system and act as a scalable example of potential power supply for many infrastructures, including future sustainable large scientific infrastructures. B4S build an interdisciplinary approach to address reliability, maintainability and costs of this technology. In April 2017, B4S successfully tested in Portugal the first world Stirling hybrid system providing about 4kW of power to a phased array of antennas, overcoming challenges in Stirling and hybridization and smartgrid technologies. B4SKA Consortium, with fourteen companies from six European countries, has performed the engineering, construction, assembly and experimental exploitation, under contract signed with the European to develop on off-grid demonstrator in Contenda (Moura) Portugal.