Normalized to: Lebach, D.
[1]
oai:arXiv.org:1509.07529 [pdf] - 1323486
VLBI for Gravity Probe B: The Guide Star IM Pegasi
Submitted: 2015-09-24
We review the radio very long baseline interferometry (VLBI) observations of
the guide star, IM Peg, and three compact extragalactic reference sources, 3C
454.3, B2250+194, and B2252+172, made in support of the NASA/Stanford gyroscope
relativity mission, GP-B. The main goal of the observations was the
determination of the proper motion of IM Peg relative to the distant universe.
VLBI observations made between 1997 and 2005 yield a proper motion of IM Peg of
-20.83 $\pm$ 0.09 mas yr$^{-1}$ in RA and -27.27 $\pm$ 0.09 mas yr$^{-1}$ in
dec, in a celestial reference frame of extragalactic radio galaxies and quasars
virtually identical to the International Celestial Reference Frame 2 (ICRF2).
They also yield a parallax for IM Peg of 10.37 $\pm$ 0.07 mas, corresponding to
a distance of 96.4 $\pm$ 0.7 pc. The uncertainties are standard errors with
statistical and estimated systematic contributions added in quadrature. These
results met the pre-launch requirements of the GP-B mission to not discernibly
degrade the estimates of the geodetic and frame-dragging effects. The paper
also reports on a 1$\sigma$ upper limit on the magnitude of the components of
the proper motion of the 'core' of 3C 454.3 relative to the ICRF2 of 46 and 56
$\mu$as yr$^{-1}$ in RA and dec, respectively, and presents densely sampled
ellipses of the parallax and the orbit of the giant of the binary system. It
further gives a sequence of images of the flickering radio emission relative to
the disk of the giant. For a 'movie of a star,' see
http://www.yorku.ca/bartel/impeg.mpg .
[2]
oai:arXiv.org:1204.4630 [pdf] - 1118155
VLBI for Gravity Probe B. I. Overview
Submitted: 2012-04-20
We describe the NASA/Stanford gyroscope relativity mission, Gravity Probe B
(GP-B), and provide an overview of the following series of six astrometric and
astrophysical papers that report on our radio observations and analyses made in
support of this mission. The main goal of this 8.5 year program of differential
VLBI astrometry was to determine the proper motion of the guide star of the
GP-B mission, the RS CVn binary IM Pegasi (IM Peg; HR 8703). This proper motion
is determined with respect to compact, extragalactic reference sources. The
results are: -20.833 +- 0.090 mas/yr and -27.267 +- 0.095 mas/yr for,
respectively, the right ascension and declination, in local Cartesian
coordinates, of IM Peg's proper motion, and 10.370 +- 0.074 mas (i.e., 96.43 +-
0.69 pc) for its parallax (and distance). Each quoted uncertainty is meant to
represent an ~70% confidence interval that includes the estimated contribution
from systematic error. These results are accurate enough not to discernibly
degrade the GP-B estimates of its gyroscopes' relativistic precessions: the
frame-dragging and geodetic effects.
[3]
oai:arXiv.org:1204.4637 [pdf] - 1118157
VLBI for Gravity Probe B. III. A Limit on the Proper Motion of the
"Core" of the Quasar 3C 454.3
Submitted: 2012-04-20
We made VLBI observations at 8.4 GHz between 1997 and 2005 to estimate the
coordinates of the "core" component of the superluminal quasar, 3C 454.3, the
ultimate reference point in the distant universe for the NASA/Stanford
Gyroscope Relativity Mission, Gravity Probe B. These coordinates are determined
relative to those of the brightness peaks of two other compact extragalactic
sources, B2250+194 and B2252+172, nearby on the sky, and within a celestial
reference frame (CRF), defined by a large suite of compact extragalactic radio
sources, and nearly identical to the International Celestial Reference Frame 2
(ICRF2). We find that B2250+194 and B2252+172 are stationary relative to each
other, and also in the CRF, to within 1-sigma upper limits of 15 and 30
micro-arcsec/yr in RA and decl., respectively. The core of 3C 454.3 appears to
jitter in its position along the jet direction over ~0.2 mas, likely due to
activity close to the putative supermassive black hole nearby, but on average
is stationary in the CRF within 1-sigma upper limits on its proper motion of 39
micro-arcsec/yr (1.0c) and 30 micro-arcsec/yr (0.8c) in RA and decl.,
respectively, for the period 2002 - 2005. Our corresponding limit over the
longer interval, 1998 - 2005, of more importance to GP-B, is 46 and 56
micro-arcsec/yr in RA and decl., respectively. Some of 3C 454.3's jet
components show significantly superluminal motion with speeds of up to ~200
micro-arcsec/yr or 5c in the CRF. The core of 3C 454.3 thus provides for
Gravity Probe B a sufficiently stable reference in the distant universe.
[4]
oai:arXiv.org:1204.4640 [pdf] - 1118158
VLBI for Gravity Probe B. V. Proper Motion and Parallax of the Guide
Star, IM Pegasi
Submitted: 2012-04-20
We present the principal astrometric results of the very-long-baseline
interferometry (VLBI) program undertaken in support of the Gravity Probe B
(GP-B) relativity mission. VLBI observations of the GP-B guide star, the RS CVn
binary IM Pegasi (HR 8703), yielded positions at 35 epochs between 1997 and
2005. We discuss the statistical assumptions behind these results and our
methods for estimating the systematic errors. We find the proper motion of IM
Peg in an extragalactic reference frame closely related to the International
Celestial Reference Frame 2 (ICRF2) to be -20.83 +- 0.03 +- 0.09 mas/yr in
right ascension and -27.27 +- 0.03 +- 0.09 mas/yr in declination. For each
component the first uncertainty is the statistical standard error and the
second is the total standard error (SE) including plausible systematic errors.
We also obtain a parallax of 10.37 +- 0.07 mas (distance: 96.4 +- 0.7 pc), for
which there is no evidence of any significant contribution of systematic error.
Our parameter estimates for the ~25-day-period orbital motion of the stellar
radio emission have SEs corresponding to ~0.10 mas on the sky in each
coordinate. The total SE of our estimate of IM Peg's proper motion is ~30%
smaller than the accuracy goal set by the GP-B project before launch: 0.14
mas/yr for each coordinate of IM Peg's proper motion. Our results ensure that
the uncertainty in IM Peg's proper motion makes only a very small contribution
to the uncertainty of the GP-B relativity tests.
[5]
oai:arXiv.org:1204.4643 [pdf] - 1118160
VLBI for Gravity Probe B. II. Monitoring of the Structure of the
Reference Sources 3C 454.3, B2250+194, and B2252+172
Submitted: 2012-04-20
We used 8.4 GHz VLBI images obtained at up to 35 epochs between 1997 and 2005
to examine the radio structures of the main reference source, 3C 454.3, and two
secondary reference sources, B2250+194 and B2252+172, for the guide star for
the NASA/Stanford relativity mission Gravity Probe B (GP-B). For one epoch in
2004 May, we also obtained images at 5.0 and 15.4 GHz. The 35 8.4 GHz images
for quasar 3C 454.3 confirm a complex, evolving, core-jet structure. We
identified at each epoch a component, C1, near the easternmost edge of the core
region. Simulations of the core region showed that C1 is located, on average,
0.18 +- 0.06 mas west of the unresolved "core" identified in 43 GHz images. We
also identified in 3C 454.3 at 8.4 GHz several additional components which
moved away from C1 with proper motions ranging in magnitude between 0.9c and
5c. The detailed motions of the components exhibit two distinct bends in the
jet axis located ~3 and ~5.5 mas west of C1. The spectra between 5.0 and 15.4
GHz for the "moving" components are steeper than that for C1. The 8.4 GHz
images of B2250+194 and B2252+172, in contrast to those of 3C 454.3, reveal
compact structures. The spectrum between 5.0 and 15.4 GHz for B2250+194 is
inverted while that for B2252+172 is flat.
Based on its position near the easternmost edge of the 8.4 GHz radio
structure, close spatial association with the 43 GHz core, and relatively flat
spectrum, we believe 3C 454.3 component C1 to be the best choice for the
ultimate reference point for the GP-B guide star. The compact structures and
inverted to flat spectra of B2250+194 and B2252+172 make these objects valuable
secondary reference sources
[6]
oai:arXiv.org:1204.4644 [pdf] - 1118161
VLBI for Gravity Probe B. VI. The Orbit of IM Pegasi and the Location of
the Source of Radio Emission
Submitted: 2012-04-20
We present a physical interpretation for the locations of the sources of
radio emission in IM Pegasi (IM Peg, HR 8703), the guide star for the
NASA/Stanford relativity mission Gravity Probe B. This emission is seen in each
of our 35 epochs of 8.4-GHz VLBI observations taken from 1997 to 2005. We found
that the mean position of the radio emission is at or near the projected center
of the primary to within about 27% of its radius, identifying this active star
as the radio emitter. The positions of the radio brightness peaks are scattered
across the disk of the primary and slightly beyond, preferentially along an
axis with position angle, p.a. = (-38 +- 8) deg, which is closely aligned with
the sky projections of the orbit normal (p.a. = -49.5 +- 8.6 deg) and the
expected spin axis of the primary. Comparison with simulations suggests that
brightness peaks are 3.6 (+0.4,-0.7) times more likely to occur (per unit
surface area) near the pole regions of the primary (|latitude| >= 70 deg) than
near the equator (|latitude| <= 20 deg), and to also occur close to the surface
with ~2/3 of them at altitudes not higher than 25% of the radius of the
primary.
[7]
oai:arXiv.org:1204.4645 [pdf] - 1118162
VLBI for Gravity Probe B. VII. The Evolution of the Radio Structure of
IM Pegasi
Submitted: 2012-04-20
We present measurements of the total radio flux density as well as
very-long-baseline interferometry (VLBI) images of the star, IM Pegasi, which
was used as the guide star for the NASA/Stanford relativity mission Gravity
Probe B. We obtained flux densities and images from 35 sessions of observations
at 8.4 GHz (wavelength = 3.6 cm) between 1997 January and 2005 July. The
observations were accurately phase-referenced to several extragalactic
reference sources, and we present the images in a star-centered frame, aligned
by the position of the star as derived from our fits to its orbital motion,
parallax, and proper motion. Both the flux density and the morphology of IM Peg
are variable. For most sessions, the emission region has a single-peaked
structure, but 25% of the time, we observed a two-peaked (and on one occasion
perhaps a three-peaked) structure. On average, the emission region is elongated
by 1.4 +- 0.4 mas (FWHM), with the average direction of elongation being close
to that of the sky projection of the orbit normal. The average length of the
emission region is approximately equal to the diameter of the primary star. No
significant correlation with the orbital phase is found for either the flux
density or the direction of elongation, and no preference for any particular
longitude on the star is shown by the emission region.
[8]
oai:arXiv.org:1204.4642 [pdf] - 1934764
VLBI for Gravity Probe B. IV. A New Astrometric Analysis Technique and a
Comparison with Results from Other Techniques
Lebach, D. E.;
Bartel, N.;
Bietenholz, M. F.;
Campbell, R. M.;
Gordon, D.;
Lederman, J. I.;
Lestrade, J. -F.;
Ransom, R. R.;
Ratner, M. I.;
Shapiro, I. I.
Submitted: 2012-04-20
When VLBI observations are used to determine the position or motion of a
radio source relative to reference sources nearby on the sky, the astrometric
information is usually obtained via: (i) phase-referenced maps; or (ii)
parametric model fits to measured fringe phases or multiband delays. In this
paper we describe a "merged" analysis technique which combines some of the most
important advantages of these other two approaches. In particular, our merged
technique combines the superior model-correction capabilities of parametric
model fits with the ability of phase-referenced maps to yield astrometric
measurements of sources that are too weak to be used in parametric model fits.
We compare the results from this merged technique with the results from
phase-referenced maps and from parametric model fits in the analysis of
astrometric VLBI observations of the radio-bright star IM Pegasi (HR 8703) and
the radio source B2252+172 nearby on the sky. In these studies we use
central-core components of radio sources 3C 454.3 and B2250+194 as our
positional references. We obtain astrometric results for IM Peg with our merged
technique even when the source is too weak to be used in parametric model fits,
and we find that our merged technique yields superior astrometric results to
the phase-referenced mapping technique. We used our merged technique to
estimate the proper motion and other astrometric parameters of IM Peg in
support of the NASA/Stanford Gravity Probe B mission.
[9]
oai:arXiv.org:astro-ph/0301413 [pdf] - 54384
VLBI imaging of the RS CVn binary star system HR 5110
Submitted: 2003-01-21
We present VLBI images of the RS CVn binary star HR 5110 (=BH CVn; HD
118216), obtained from observations made at 8.4 GHz on 1994 May 29/30 in
support of the NASA/Stanford Gravity Probe B project. Our images show an
emission region with a core-halo morphology. The core was 0.39 +/- 0.09 mas
(FWHM) in size, or 66% +/- 20% of the 0.6 +/- 0.1 mas diameter of the
chromospherically active K subgiant star in the binary system. The halo was
1.95 +/- 0.22 mas (FWHM) in size, or 1.8 +/- 0.2 times the 1.1 +/- 0.1 mas
separation of the centers of the K and F stars. The core increased
significantly in brightness over the course of the observations and seems to
have been the site of flare activity that generated an increase in the total
flux density of ~200% in 12 hours. The fractional circular polarization
simultaneously decreased from ~10% to 2.5%.