Normalized to: Lavalley, C.
[1]
oai:arXiv.org:1508.07584 [pdf] - 1938088
Data model issues in the Cherenkov Telescope Array project
Contreras, J. L.;
Satalecka, K.;
Bernlöhr, K.;
Boisson, C.;
Bregeon, J.;
Bulgarelli, A.;
de Cesare, G.;
Reyes, R. de los;
Fioretti, V.;
Kosack, K.;
Lavalley, C.;
Lyard, E.;
Marx, R.;
Rico, J.;
Sanguillot, M.;
Servillat, M.;
Walter, R.;
Ward, J. E.;
Zoli, A.
Submitted: 2015-08-30
The planned Cherenkov Telescope Array (CTA), a future ground-based
Very-High-Energy (VHE) gamma-ray observatory, will be the largest project of
its kind. It aims to provide an order of magnitude increase in sensitivity
compared to currently operating VHE experiments and open access to guest
observers. These features, together with the thirty years lifetime planned for
the installation, impose severe constraints on the data model currently being
developed for the project.
In this contribution we analyze the challenges faced by the CTA data model
development and present the requirements imposed to face them. While the full
data model is still not completed we show the organization of the work, status
of the design, and an overview of the prototyping efforts carried out so far.
We also show examples of specific aspects of the data model currently under
development.
[3]
oai:arXiv.org:1212.4115 [pdf] - 603688
Extending the Fermi-LAT Data Processing Pipeline to the Grid
Submitted: 2012-12-17
The Data Handling Pipeline ("Pipeline") has been developed for the Fermi
Gamma-Ray Space Telescope (Fermi) Large Area Telescope (LAT) which launched in
June 2008. Since then it has been in use to completely automate the production
of data quality monitoring quantities, reconstruction and routine analysis of
all data received from the satellite and to deliver science products to the
collaboration and the Fermi Science Support Center. Aside from the
reconstruction of raw data from the satellite (Level 1), data reprocessing and
various event-level analyses are also reasonably heavy loads on the pipeline
and computing resources. These other loads, unlike Level 1, can run
continuously for weeks or months at a time. In addition it receives heavy use
in performing production Monte Carlo tasks.
The software comprises web-services that allow online monitoring and provides
charts summarizing work flow aspects and performance information. The server
supports communication with several batch systems such as LSF and BQS and
recently also Sun Grid Engine and Condor. This is accomplished through
dedicated job control services that for Fermi are running at SLAC and the other
computing site involved in this large scale framework, the Lyon computing
center of IN2P3. While being different in the logic of a task, we evaluate a
separate interface to the Dirac system in order to communicate with EGI sites
to utilize Grid resources, using dedicated Grid optimized systems rather than
developing our own. (abstract abridged)