Chowdhury, J.
Normalized to: Chowdhury, J.
1 article(s) in total. 52 co-authors. Median position in authors list is 12,0.
[1]
oai:arXiv.org:1803.11235 [pdf] - 1821092
The CHIME Fast Radio Burst Project: System Overview
Collaboration, The CHIME/FRB;
:;
Amiri, M.;
Bandura, K.;
Berger, P.;
Bhardwaj, M.;
Boyce, M. M.;
Boyle, P. J.;
Brar, C.;
Burhanpurkar, M.;
Chawla, P.;
Chowdhury, J.;
Cliche, J. F.;
Cranmer, M. D.;
Cubranic, D.;
Deng, M.;
Denman, N.;
Dobbs, M.;
Fandino, M.;
Fonseca, E.;
Gaensler, B. M.;
Giri, U.;
Gilbert, A. J.;
Good, D. C.;
Guliani, S.;
Halpern, M.;
Hinshaw, G.;
Hofer, C.;
Josephy, A.;
Kaspi, V. M.;
Landecker, T. L.;
Lang, D.;
Liao, H.;
Masui, K. W.;
Mena-Parra, J.;
Naidu, A.;
Newburgh, L. B.;
Ng, C.;
Patel, C.;
Pen, U. -L;
Pinsonneault-Marotte, T.;
Pleunis, Z.;
Ravandi, M. Rafiei;
Ransom, S. M.;
Renard, A.;
Scholz, P.;
Sigurdson, K;
Siegel, S. R.;
Smith, K. M.;
Stairs, I. H.;
Tendulkar, S. P.;
Vanderlinde, K.;
Wiebe, D. V.
Submitted: 2018-03-29
The Canadian Hydrogen Intensity Mapping Experiment (CHIME) is a novel transit
radio telescope operating across the 400-800-MHz band. CHIME is comprised of
four 20-m x 100-m semi-cylindrical paraboloid reflectors, each of which has 256
dual-polarization feeds suspended along its axis, giving it a >200 square
degree field-of-view. This, combined with wide bandwidth, high sensitivity, and
a powerful correlator makes CHIME an excellent instrument for the detection of
Fast Radio Bursts (FRBs). The CHIME Fast Radio Burst Project (CHIME/FRB) will
search beam-formed, high time-and frequency-resolution data in real time for
FRBs in the CHIME field-of-view. Here we describe the CHIME/FRB backend,
including the real-time FRB search and detection software pipeline as well as
the planned offline analyses. We estimate a CHIME/FRB detection rate of 2-42
FRBs/sky/day normalizing to the rate estimated at 1.4-GHz by Vander Wiel et al.
(2016). Likely science outcomes of CHIME/FRB are also discussed. CHIME/FRB is
currently operational in a commissioning phase, with science operations
expected to commence in the latter half of 2018.