Normalized to: Chaminade, T.
[1]
oai:arXiv.org:2001.04510 [pdf] - 2054159
A NECTAr-based upgrade for the Cherenkov cameras of the H.E.S.S.
12-meter telescopes
Ashton, Terry;
Backes, Michael;
Balzer, Arnim;
Berge, David;
Bolmont, Julien;
Bonnefoy, Simon;
Brun, Francois;
Chaminade, Thomas;
Delagnes, Eric;
Fontaine, Gerard;
Füßling, Matthias;
Giavitto, Gianluca;
Giebels, Berrie;
Glicenstein, Jean-Francois;
Gräber, Tobias;
Hinton, Jim;
Jahnke, Albert;
Klepser, Stefan;
Kossatz, Marko;
Kretzschmann, Axel;
Lefranc, Valentin;
Leich, Holger;
Lenain, Jean-Philippe;
Lüdecke, Hartmut;
Lypova, Iryna;
Manigot, Pascal;
Marandon, Vincent;
Moulin, Emmanuel;
Murach, Thomas;
de Naurois, Mathieu;
Nayman, Patrick;
Ohm, Stefan;
Penno, Marek;
Ross, Duncan;
Salek, David;
Schade, Markus;
Schwab, Thomas;
Shiningayamwe, Kleopas;
Stegmann, Christian;
Steppa, Constantin;
Tavernet, Jean-Paul;
Thornhill, Julian;
Toussnel, Francois;
Vincent, Pascal
Submitted: 2020-01-13
The High Energy Stereoscopic System (H.E.S.S.) is one of the three arrays of
imaging atmospheric Cherenkov telescopes (IACTs) currently in operation. It is
composed of four 12-meter telescopes and a 28-meter one, and is sensitive to
gamma rays in the energy range ~30 GeV - 100 TeV. The cameras of the 12-m
telescopes recently underwent a substantial upgrade, with the goal of improving
their performance and robustness. The upgrade involved replacing all camera
components except for the photomultiplier tubes (PMTs). This meant developing
new hardware for the trigger, readout, power, cooling and mechanical systems,
and new software for camera control and data acquisition. Several novel
technologies were employed in the cameras: the readout is built around the new
NECTAr digitizer chip, developed for the next generation of IACTs; the camera
electronics is fully controlled and read out via Ethernet using a combination
of FPGA and embedded ARM computers; the software uses modern libraries such as
Apache Thrift, ZMQ and Protocol buffers. This work describes in detail the
design and the performance of the upgraded cameras.
[2]
oai:arXiv.org:1708.04550 [pdf] - 1783695
Performance of the upgraded H.E.S.S. cameras
Bonnefoy, S.;
Ashton, T.;
Backes, M.;
Balzer, A.;
Berge, D.;
Brun, F.;
Chaminade, T.;
Delagnes, E.;
Fontaine, G.;
Füßling, M.;
Giavitto, G.;
Giebels, B.;
Glicenstein, J. F.;
Gräber, T.;
Hinton, J. A.;
Jahnke, A.;
Klepser, S.;
Kossatz, M.;
Kretzschmann, A.;
Lefranc, V.;
Leich, H.;
Lenain, J. P.;
Lüdecke, H.;
Lypova, I.;
Manigot, P.;
Marandon, V.;
Moulin, E.;
de Naurois, M.;
Nayman, P.;
Ohm, S.;
Penno, M.;
Ross, D.;
Salek, D.;
Schade, M.;
Schwab, T.;
Shiningayamwe, K.;
Stegmann, C.;
Steppa, C.;
Thornhill, J.;
Toussenel, F.
Submitted: 2017-08-15
The 14 years old cameras of the H.E.S.S. 12-m telescopes have been upgraded
in 2015/2016, with the goals of reducing the system failure rate, reducing the
dead time and improving the overall performance of the array. This conference
contribution describes the various tests that were carried out on the cameras
and their sub-components both in the lab and on site. It also gives an overview
of the commissioning and calibration procedures adopted during and after the
installation, including e.g. flat-fielding and trigger threshold scans.
Finally, it reports in detail about the overall performance of the four new
H.E.S.S. I cameras, using very recent data.
[3]
oai:arXiv.org:1707.04415 [pdf] - 1779472
Hardware and software architecture of the upgraded H.E.S.S. cameras
Klepser, S.;
Ashton, T.;
Backes, M.;
Balzer, A.;
Berge, D.;
Bonnefoy, S.;
Brun, F.;
Chaminade, T.;
Delagnes, E.;
Fontaine, G.;
Füßling, M.;
Giavitto, G.;
Giebels, B.;
Glicenstein, J. F.;
Gräber, T.;
Hinton, J. A.;
Jahnke, A.;
Kossatz, M.;
Kretzschmann, A.;
Lefranc, V.;
Leich, H.;
Lenain, J. P.;
Lüdecke, H.;
Lypova, I.;
Manigot, P.;
Marandon, V.;
Moulin, E.;
de Naurois, M.;
Nayman, P.;
Ohm, S.;
Penno, M.;
Ross, D.;
Salek, D.;
Schade, M.;
Schwab, T.;
Shiningayamwe, K.;
Stegmann, C.;
Steppa, C.;
Thornhill, J.;
Toussenel, F.
Submitted: 2017-07-14
In 2015/16, the photomultiplier cameras of the H.E.S.S. Cherenkov telescopes
CT1-4 have undergone a major upgrade. The entire electronics has been replaced,
using NECTAr chips for the front-end readout. A new ventilation system has been
installed and several auxiliary components have been replaced. Besides this,
the internal control and readout software was rewritten from scratch in a
modern and modular way. Ethernet technology was used wherever possible to
ensure both flexibility, stability and high bandwidth. An overview of the
installed components will be given.
[4]
oai:arXiv.org:1509.01232 [pdf] - 1271229
A major electronics upgrade for the H.E.S.S. Cherenkov telescopes 1-4
Giavitto, G.;
Ashton, T.;
Balzer, A.;
Berge, D.;
Brun, F.;
Chaminade, T.;
Delagnes, E.;
Fontaine, G.;
Füßling, M.;
Giebels, B.;
Glicenstein, J. F.;
Gräber, T.;
Hinton, J. A.;
Jahnke, A.;
Klepser, S.;
Kossatz, M.;
Kretzschmann, A.;
Lefranc, V.;
Leich, H.;
Lüdecke, H.;
Manigot, P.;
Marandon, V.;
Moulin, E.;
de, M.;
Nayman, P.;
Penno, M.;
Ross, D.;
Salek, D.;
Schade, M.;
Schwab, T.;
Simoni, R.;
Stegmann, C.;
Thornhill, J.;
Toussenel, F.
Submitted: 2015-09-03
The High Energy Stereoscopic System (H.E.S.S.) is an array of imaging
atmospheric Cherenkov telescopes (IACTs) located in the Khomas Highland in
Namibia. It consists of four 12-m telescopes (CT1-4), which started operations
in 2003, and a 28-m diameter one (CT5), which was brought online in 2012. It is
the only IACT system featuring telescopes of different sizes, which provides
sensitivity for gamma rays across a very wide energy range, from ~30 GeV up to
~100 TeV. Since the camera electronics of CT1-4 are much older than the one of
CT5, an upgrade is being carried out; first deployment was in 2015, full
operation is planned for 2016. The goals of this upgrade are threefold:
reducing the dead time of the cameras, improving the overall performance of the
array and reducing the system failure rate related to aging. Upon completion,
the upgrade will assure the continuous operation of H.E.S.S. at its full
sensitivity until and possibly beyond the advent of CTA. In the design of the
new components, several CTA concepts and technologies were used and are thus
being evaluated in the field: The upgraded read-out electronics is based on the
NECTAR readout chips; the new camera front- and back-end control subsystems are
based on an FPGA and an embedded ARM computer; the communication between
subsystems is based on standard Ethernet technologies. These hardware solutions
offer good performance, robustness and flexibility. The design of the new
cameras is reported here.
[5]
oai:arXiv.org:1412.0481 [pdf] - 904505
A Scientific Trigger Unit for Space-Based Real-Time Gamma Ray Burst
Detection, II - Data Processing Model and Benchmarks
Submitted: 2014-12-01
The Scientific Trigger Unit (UTS) is a satellite equipment designed to detect
Gamma Ray Bursts (GRBs) observed by the onboard 6400 pixels camera ECLAIRs. It
is foreseen to equip the low-Earth orbit French-Chinese satellite SVOM and acts
as the GRB trigger unit for the mission. The UTS analyses in real-time and in
great details the onboard camera data in order to select the GRBs, to trigger a
spacecraft slew re-centering each GRB for the narrow field-of-view instruments,
and to alert the ground telescope network for GRB follow-up observations. A few
GRBs per week are expected to be observed by the camera; the UTS targets a
close to 100% trigger efficiency, while being selective enough to avoid fake
alerts. This is achieved by running the complex scientific algorithms on a
radiation tolerant hardware, based on a FPGA data pre-processor and a CPU with
a Real-Time Operating System. The UTS is a scientific software, firmware and
hardware co-development. A Data Processing Model (DPM) has been developed to
fully validate all the technical choices deeply impacted by the ITAR
restriction applied to the development. The DPM permits to evaluate the
processing power and the memory bandwidth, and to adjust the balance load
between software and firmware. This paper presents the UTS DPM functionalities
and architecture. It highlights the results obtained with the full GRB trigger
algorithms implemented on a rad-tolerant ITAR-free processor.